Case Interview Example – Estimation Question and Answer
I was asked the following management consulting estimation question by a McKinsey interviewer many years ago:
“Estimate how long it would take to move or relocate an average size mountain 10 miles using an average size truck”
Below you will see my answer to this estimation question and the process and rational I use to answer this specific question can be used as a template to practice answering other estimation questions as you prepare for case interviews.
The first thing to realize in an estimation question is that an acceptable answer MUST mention a specific number.
This question was how much time it takes to move an average mountain 1 mile (or something along those lines).
If the answer does not include a specific unit of time like X hours, Y days, Z years, then the answer is not acceptable.
By the way, I use the word “acceptable answer” instead of “correct answer” very deliberately. The interviewer’s evaluation in this type of question is in assessing the approach you took, not necessarily the specific answer you gave.
The next thing to the answer must include is that explicit assumptions must be made.
It is not possible to answer this question without making some assumptions. They key is to EXPLAIN to the interview that you are going to make some assumptions. Once you do and once you make a specific assumption, explain your rationale behind that assumption.
For example, when I was given this question. I knew that I needed to estimate the cubic volume of the mountain. And since the mountain loosely resembles a cone, I knew there was a geometric formula to calculate the volume of a cone–except I did not recall the specific formula off the top off my head.
So my interviewer suggested that I estimate the formula of a cone, which in turn I would use to estimate the volume of an average size mountain, which would then be part of a calculation to estimate the average time it would take to re-locate it.
Notice the estimate that is nested within the estimate here. This is very common. Most important thing is to not get mixed up and confused by your own work.
I find it is useful to just write out the formula that will produce the estimate FIRST, THEN go about making reasonable assumptions.
For the move the mountain case, the formula I wrote up on the white board during my interview was:
volume of mountain / volume of a truck * time per truck trip = total time to move a mountain
I would literally write that on the board. That is the amount of time it would take 1 truck to move an average size mountain 10 miles (the 1 truck is an assumption as well)
Then I went about estimating each of those 3 factors.
Assume the average size mountain is 1 mile tall, 1 mile wide, and the shape of a cone. That’s approximately 5,000 ft in height and base.
I forge the formula to calculate the volume of a cone, but if I eye ball it, it is probably a little more volume than half of a cube of similar size height and base.
The volume of a cube that’s 5,000 ft tall, 5,000 ft wide, and 5,000 ft deep is 125,000,000,000 cubic ft.
Since I’m trying to estimate a CONE, and not a CUBE, I’d then take 125,000,000,000 x 50% (my approximate guess as to how much smaller a cone is vs a cube of approximately the same height, and width and length at the base.
With some slight rounding, that gets us 60,000,000,000.
Then underneath my original formula, I would write the following:
60,000,000,000 cubic ft / volume of a truck * time per truck trip = total time to move mountain
Next, I would move on to estimate the volume of a truck.
The carrying capacity of a cargo truck is the width x length x heightof the cargo container.
I said, well I know those big trucks are a little wider than my car, but not by much since they still must be able to fit into a lane on the freeway. My car sits 3 people across, assuming 2 ft in shoulder width per person, that’s 6 ft of interior space. Let’s add on a little more and assume those big trucks are around 8 ft in width.
I know they are about double the length of most passenger sedans. And lets see if I were to lie down in the driver’s seat to take a nap, I cover most of the interior cabin space. And the hood and trunk of the car combined are about the same length as the interior cabin. I’m a little under 6ft tall, so that makes my car around 12 ft long. If I double that, I get the length of one of those trucks to be 24 ft long. I subtract out say 4 ft for the driver compartment, and that leaves me about 20 ft in length for the cargo area.
Last time I looked, I saw a worker standing in the back of one of the cargo areas, and the cargo area was taller than the person. I figure the cargo container is about 8 ft tall. And since most freeway bridges have signs that say “height 13 ft” and I know those trucks can go under those bridges, assuming an 8ft cargo section and a 4ft for the tires and chassis under the cargo area, that gives me 12 ft…which does seem to triangulate with the height of those underpasses. So I’ll say the cargo section is approximately 8 ft tall.
The volume of the cargo area of an earth moving truck is:
8 ft wide x 20 ft long x 8 ft tall = 1,280 cubic feet
For sake of simplicity, I’m going to round that down to 1,250 cubic feet and plug this number back into my original formula which now reads as follows:
60,000,000,000 cubic foot mountain / 1,250 cubic foot truck capacity * time for truck trip = total time to move a mountain
The only factor missing in our estimate is figuring out the round-trip time for a trip to move 10 miles, drop its load, and return the 10 miles. Let’s figure out the travel time first. Assume the truck travels on the freeway at 60 miles per hour.
For it to travel 10 miles, it does so in 1/6 and hour or 10 minutes. The drive time is 10 minutes to the new location, and 10 minutes returning to the old mountain for a total of 20 minutes. Assume that the off-loading process has been designed to be pretty quick. The load is just “dropped” and then repositioned while the truck is on its return trip (as opposed to being scooped out of the truck, one scoop at time which seems more time consuming).
That means each round trip takes 30 minutes or 0.5 hours.
Let’s go back to our formula again and update it.
60,000,000,000 cubic ft mountain / 1,250 cubic foot track capacity * 0.5 hours per truck trip = total time to move a mountain
Let me do the math now. For the first 2 components of the formula, that works out to about 50,000,000 (50 million truck loads).
50 million truck loads x 0.5 hours, thats 25 million hours to move a mountain.
If we assume a typical day has 25 hours (to make our math a little simpler), that’s 1 million days to move the mountain using only 1 truck. That works out to a bit under 3,000 years
That is the logic I just presented is a pretty good one that would most likely pass most estimation question interviews.
You will notice that for every little component I explain WHY I felt that was a reasonable assumption.
There is a big difference between making a wild assumption vs. a reasonable one. Your goal is to make as reasonable assumption as you can come up with. When you make such an assumption, it is very important you explain WHY you made the assumption you did.
The math is not that complicated (it’s math we all learned before high school) BUT communicating what you are doing is just as important.
It is also important that you do not make a math mistake. I wrote out this example quickly and hopefully I did not make a math mistake.
If I did make a math mistake, I would full expect to get rejected even if I got the logic and assumptions largely right.
That’s just the way it works. Practice your mental math. You DO use it a lot not just in interviews but with clients as well.
504 thoughts on “Estimation Question”
I assume the mountain is a cone:
– radius = 1,5 km
– height = 3 km
–> Volume = approximately 7 km^3 (7.000.000 m^3)
I assume the truck’s trailer measures as follows:
– length: 10 m
– width: 4 m
– height: 4 m
–> Volume of the truck’s trailer is 160 m^3
I assume the truck travels at an average speed of 50 miles/hour, which means it takes 2 minutes to drive 10 miles, therefore a total of 4 minutes to drive back and forth from the old to the new site. At this speed, the truck will need:
# trips = 7.000.000/160 = 43.750 to move the whole mountain
At 4 minutes each it gives 175.000 minutes which means:
– 2.917 hours
– 122 days
– 4 months
I also assumed the truck works 24 hours per day, 7 days a week.
Bests
1.5 years
100,000,000 minutes or 1,666,666.67 hours
96 hrs
Assumption: Mountain is cone-shaped
Height = 3000 m
Diameter = 1000 m
volume of mountain = (1/3)*pi*r^2*h = pi*500*500*1000 = 25*pi MM cu. m
1 truck container = 10m * 2m * 2m = 40 cu. m
Number of trips required = (25*pi MM / 40) = 2 MM (appx)
Distance = 2*10 MM mi
avg speed = 30 mi/h
Continuous time = 20 MM/30 = 80 years (appx)
Fuel Tank = 100 L
Mileage = 10 mi/L
Therefore refuel after 1000 mi
Therefore number of fillups = 20 MM/1000 = 20K
Refill time = 10 min/refill
Total refill time = 200 K min = 4 months (appx)
Total movement time = 80 years – 4 months = 79 years and 8 months.
Problem: how long will it take to move an average size mountain 10 miles using an average sized truck?
first reflection – that seem like a far from practical approach…
Overall Method: Time = distance/speed (hours)
Speed – estimate speed (average speed for fully loaded truck and empty truck) (km/hours)
Total distance – estimate no. of times truck would need to move total volume (km)
Total volume – estimate (m3)
Total time = distance x 2 x (tot mountain volume/truck volume) / average speed (hours)
Calculation = 16*2*(2 500 000 /160) / 50 => appr 10 000 hours
realistically: assuming working 8 hours/day, 5 days/week and 50 weeks per year => 4,5 years – my answer
Note, we don’t have very big mountains or many weeks of vacation where I come from 😉
I assume the mountain as a cone. Assuming the height and radius to be 2000mtrs and 500mtrs respectively the total volume of the mountain stands at 50,00,00,000 cubic meters.
Now I calculate the volume of the truck used as having dimensions 10x5x5=250 cubic meters
So it would take the truck 20,00,000 rounds to get the truck load to the new site 10 miles away.
Assuming that the truck takes 20 mins to load and 10 mins to unload at the new site. That makes the loading-unloading time of 30mins per trip.
Now if the truck travels with an average of 100 miles/hour. The truck should take 6 mins to get to the new location.
So the total time taken for the mountain rubble to be transportated is 30 6=36 minutes.
Since this trip is to be repeated 20,00,000 times so total time taken in minutes = 7,20,00,000 minutes
That comes down to 4166.6667 years. I wonder if that is a logical answer though.
This is the first estimation question that I have attempted. Your reviews on how well I did it are awaited.
#Note for Mr. Cheng- I dont know if i should be saying this since you are too experienced and seasoned in what you are doing here. You are doing an excellent job at guiding us beautifully on how to go about the case interviews and otherwise too. Your insights are a real help.#aspiring consultant.
66,666 hrs
15,000 hours
0 days 0 hours 0 minutes.
The base of an average mountain spans over 10 miles because a mountain needs a large base to reach an average hight.